“Roman did a good job of meeting with the owner and showing them what could be done to reduce some costs, maintain good light levels, and still meet the budget.”
Ross Eggert, Project Manager, C.G. Schmidt
Challenge
A repeat client of Roman Electric, St. Anne’s asked us to provide high-quality services while keeping costs reasonable.
Solution
We turned to our value engineering capabilities to keep costs under control.
Project Details
General Contractor: C.G. Schmidt
Project Size: 80,000 sq. ft.
Location: Milwaukee, WI
- Low Voltage Systems
- New Construction
- Power & Lighting
Bucyrus Campus, the two-story, 80,000 sq. ft. building provides child care and adult day care services that have drawn national attention. The Bucyrus Center began with a staff of 45 people but could eventually bring 200 jobs to the neighborhood.