24/7 Emergency Service

PROJECTS

John PszonakVice President of Construction, Berghammer Construction Corp.
Read More

Roman Electric was pivotal to the success of our job. They were the first subcontractor on site and the last to ensure everything worked properly. They made a seamless transition for our client into their new facility.

Glenn Rieder

Challenge

Roman Electric was hired to provide underground feeds for both line voltage and low voltage to over 200 pieces of equipment. Stub-up locations needed to be within an inch of their designated locations.

Solution

Through the use of CAD and a Trimble Total Station, Roman Electric hit the mark on every conduit stub-up.

General Contractor :

Berghammer Construction

Project Size :

118,140 sq. ft.

Location :

West Allis, WI

Design/Build
New Construction
Power & Lighting