“Roman is an excellent contractor. We felt like they were always part of our team throughout the construction. They definitely met and exceeded our expectations.”
Rich Severson, Project Executive, C.D. Smith
Challenge
7seventy7 was one of the largest projects in Roman’s history, requiring design/build services for electrical low voltage and audio/visual components and installation in a building with very few drywall ceilings.
Solution
Turning to our experience on other massive projects, we tackled the design/build challenges and used a high-tech laser positioning system to embed conduit directly into the concrete.
Project Details
General Contractor: CD Smith
Location: Milwaukee, WI
Project Size: 310 Units
- Design/Build
- Energy Efficiency
- Low Voltage Systems
- New Construction
- Power & Lighting