24/7 Emergency Service

Kenall Manufacturing

“Roman did a very good job. Their people were on site as needed and always worked with us to reduce cost wherever possible. They were flexible in handling any change orders and kept everything close to budget.”

Randy Hernandez, Vice President of Operations, Kenall Manufacturing

Challenge

Relocate the existing Kenall manufacturing plant to a whole new facility, while providing the electrical solutions they would need now and in the years to come.

Solution

Roman’s team spent several weeks inventorying the existing power requirements in order to design a new distribution system adequate to feed both the existing and future equipment in the new building.

Project Details

General Alston Constructon
Location: Kenosha, WI
Project Size: 353,890 sq. ft.

  • Design/Build
  • Energy Efficiency
  • Low Voltage Systems
  • New Construction
  • Power & Lighting