24/7 Emergency Service

2040 Lofts

“Roman did a wonderful job. The first phase was an intense, challenging project. It was more difficult and required a lot of coordination with WE Energies. The project was kind of the crown jewel for us and Roman. They did so well on the first phase that we, as well as the owners, wanted them to do the second phase too.”

Ryan Raskin, Project Manager, Altius

Challenge

Roman was tasked with installing new electrical wiring systems for residences into a 100-year old concrete building.

Solution

Roman Electric worked closely with other trades to conceal wiring to provide a comfortable living space.

Project Details

General Altius Building Co.
Location: Milwaukee, WI
Project Size: Phase 1: 127,850 sq. ft., Phase 2: 130,929 sq. ft

  • Design/Build
  • Low Voltage Systems
  • Power & Lighting
  • Renovation

Roman TechNet installed a fiber backbone and a large copper backbone that allowed data and voice services to be routed from the older building to the new building. TechNet also installed voice, data and cable TV in the new building for Time Warner.

Share the Post:

Related Posts

Raising Canes

Challenge A repeat client of Roman Electric, St. Anne’s asked us to provide high-quality services while keeping costs reasonable. Solution

Read More